All the Key Personnel and employees of ZERBINA ENGINEERING have tremendous and vast experiences in delivering the core expertise of the Company.
Attached is a list, detailing all the projects and works undertaken over a period of 11 years, from year 2000 to 2011.
We strive towards a positive risk culture in which everyone evaluates risk in relation to tasks carried out on a day-to-day basis.
ZERBINA ENGINEERING is proud to have them on board to offer similar exemplary services to all the Company’s clients.
ZERBINA ENGINEERING has also undertaken huge investments in acquiring all required machines, Particle Counter, Filtration Units, Flushing/Chemical Cleaning pump sets, generating sets, UHP Jetting Machines, welding machines etc. including all auxiliary equipment required to provide exceptional service to all our existing and future clients.
PROJECT TRACK RECORD 2000-2011

Project Track Record 2013

No. Project Title Owner Client Completion Date
1. Supply and Installation Factory's
Industrial Siren
Bukit Fraser Thermal Technology Sdn Bhd

Bukit Fraser Thermal Technology Sdn Bhd

March 2013

2. Inspection, Rewiring and Installation of Highbay Lighting Bukit Fraser Thermal Technology Sdn Bhd Bukit Fraser Thermal Technology Sdn Bhd March 2013
3. Hydraulic Oil Flushing Of 9 Units Of Loading Arms Bukit Fraser Thermal Technology Sdn Bhd Bukit Fraser Thermal Technology Sdn Bhd April 2013
4. Emergency Electrical Inspection Bukit Fraser Thermal Technology Sdn Bhd Bukit Fraser Thermal Technology Sdn Bhd April 2013
5. Rental - Portable Laser Particle Counter
(Offshore Bekok C)
Petronas Carigali Sdn Bhd Disya Resources Sdn Bhd July 2013
6. Hydraulic Oil Flushing Of 1 Unit of Loading
Arms-RA 12-1275 Kogas-LA631
FMC Wailic (M) Sdn Bhd (JOHOR) May 2013
7. Hydraulic Oil Flushing Of Loading Arms
-Ra 12-17275
FMC Wailic (M) Sdn Bhd (JOHOR) June 2013
8. Acid Cleaning-Carbon Steel Piping (Chemical Cleaning of Internal Pipe Surface by Using Circulation Method) Jebsen & Jessen Technology (M) Sdn Bhd Jebsen & Jessen Technology (M) Sdn Bhd July 2013

Project Track Record 2011

No. Project Title Owner Client Completion Date
1. Cleaning of MLNG Tiga Condensate Stabilizer Train 1 by Hot Water Circulation. Malaysia LNG Sdn Bhd Malaysia LNG Sdn Bhd July 2011
2. East Piatu Development Project – Chemical Cleaning Lube Oil Flushing, Boroscope Inspection   Kencana HL Sdn Bhd August 2011
3. Chemical Cleaning Works for F28DR-A Project – Sarawak Shell Berhad Sarawak Shell Berhad MSET Engineering Corp. Sdn Bhd February 2011
4. Chemical Cleaning Works for Kinabalu (KNPG-B) Topside Project   MSET Engineering Corp. Sdn Bhd February 2011

Project Track Record 2010

No. Project Title Owner Client Completion Date
1. Supply Of Manpower, Supervision, Tools, Equipment And Consumables For Acid Cleaning Work.  

Malaysia Marine and Heavy Engineering Sdn Bhd

October 2010

2. St. Joseph Re-Development Project Acid Cleaning And Lube Oil Flushing.   Brooke Dockyard & Engineering Work Corporation September 2010
3. Hydraulic Oil Pipeline Flushing – HPPI Sticker / Reclaimer at Jimah Power Plant   Shin Eversendai (M) Sdn Bhd July 2010
4. Chemical Cleaning Works for S-22352 Filter at PPTSB Manpower Supply, Rental of Equipment and other Consumables. Petronas Penapisan Terengganu S/B HSE Resources Sdn Bhd April 2011
5. External Chemical Cleaning Works at GT1 Fin Fan Cooler at Gelugor Power Station. Tenaga Nasional Berhad Stesen Janaelektrik Gelugor, Penang March 2010
6. Chemical Cleaning Works for St. Joseph Re- Development Project – Sarawak Shell Berhad Sarawak Shell Berhad MSET Engineering Corp. Sdn Bhd February 2010
7. Fabrication of CPDR-A Topside – Chemical Cleaning Works   Kencana HL Sdn Bhd February 2010

Project Track Record 2009

No. Project Title Owner Client Completion Date
1. Heat Exchanger, E-1750A Cleaning Work To Perform Cleaning of Heat Exchanger E-1750A onboard FPSO Bunga Kertas (BUK-WSR-PRD-015-09) Petronas Carigali Sdn Bhd FPSO Ventures Sdn Bhd

December 2009

2. Dulang-Field Compressed Gas Facility Enhancement (DL-B). Chemical Cleaning & Lube Oil Flushing Works   Kencana HL Sdn Bhd

January 2010

3. Design and Supply of Pressure Vessels Package For Cili Padi Gas Development Project – Skids – Chemical Cleaning Job.   MSET Engineering Corporation Sdn Bhd August 2009
4. Chemical Cleaning Work at Pulai A Platform (Offshore) KSB Phase 1.   Highbase Strategic Sdn Bhd

JUne 2009

5. Mechanical and Piping Installation Works of Bintulu Onshore Receiving Facility (BORF) for SK309/311 Phase 1 Gas Development Project Provision of Chemical Cleaning of Additional PG & FG Piping System. Murphy Oil Kencana Infrastructure Sdn Bhd August 2009
6. EMAX Passivation Works, Chemical Cleaning, Waste Water Treatment- Supply of Manpower, Equipment and Others. Ethylene Malaysia Sdn Bhd Toyo Engineering & Construction Sdn Bhd July 2009
7. Provision of supply manpower, supervision, equipment, tools and consumables for Acid Cleaning Works. – B11KA   Malaysia Marine and Heavy Engineering Sdn Bhd August 2009
8. Chemical Cleaning Services for GRVE Pipings for F23 VLAP Compression Modules. Sime Darby Engineering Sdn Bhd Pacific Advance Composites Sdn Bhd April 2009
9. Chemical Cleaning of Unit 5 Boiler Kapar Energy Ventures Sdn Bhd Kapar Energy Ventures Sdn Bhd

July 2009

10. Chemical Cleaning Works for Kumang Skid Project PCSB (F9JT-A)   MSET Engineering Corp. Sdn Bhd April 2009
11. Chemical Cleaning of FPSO Bunga Kertas : Hot Oil Piping Systems Inclusive of V-6500, E-1710 and HX6510/6520 Petronas Carigali Sdn Bhd Highbase Strategic Sdn Bhd April 2009
12. Chemical Cleaning / of Pipe Work and Rental of Equipment   Pathfinder M & E Sdn Bhd January 2009

Project Track Record 2008

No. Project Title Owner Client Completion Date
1. Compressor complete with piping cleaning

EMSB

Toyo Engineering & Construction Sdn Bhd December 2008
2. ST ACC & ABC Fins Chemical Cleaning Tenaga Nasional Berhad TNBG SJ Jambatan February 2009
3. Chemical Cleaning of Unit 1 Boiler Kapar Energy Ventures Kapar Energy Ventures Sdn Bhd January 2009
4. Provision of and Chemical Cleaning for new Pipelines. Murphy Sarawak Oil Co. Ltd. Murphy Sarawak Oil Co. Ltd. October 2008
5. Chemical Cleaning Works For Shell GTG Pipings Petronas Carigali Sdn Bhd MSET Engineering Corp. Sdn Bhd September 2008
6. Chemical Cleaning for SS Piping & Filter Coalescer Vessel-Angsi Power Gas System Skid Internal Chemical Cleaning of Incoloy 825 Piping for Shell GTG Skid Project. Petronas Carigali Sdn Bhd MSET Engineering Corp. Sdn Bhd August 2008
7. To supply labour, PPE, test kits, other overheads to perform and complete the Acid Cleaning Works for FG Line.   Ramunia Fabricators Sdn Bhd August 2008
8. Chemical Cleaning of Unit 2 Boiler Kapar Energy Ventures Kapar Energy Ventures Sdn Bhd November 2008
9. For the work External Chemical Cleaning of GT1 Fin Fan Cooler at Stesen Janaelektrik Gelugor.
Provision of Manpower, Rental of Equipment, Material and Consumable items to perform the chemical cleaning.
Tenaga Nasional Berhad Stesen Janaelektrik Gelugor, Bahagian Penjanaan. June 2008
10. Chemical Cleaning Works for 2 Units of SQE Furnaces for Optimal Olefin Plant at Dialog Kertih Old Workshop for Optimal Chemicals (M) Sdn Bhd.
Chemical Cleaning & Waste Management Services.
Optimal Chemicals Sdn Bhd Dialog Plant Services Sdn Bhd April 2008
11. Chemical Cleaning for GRE Portable Water Supply of manpower, equipments and other consumables items for GRE Piping Works for Bunga Orkid-A (BOA) CPP Topside.   Pacific Advance Composites Sdn Bhd February 2008
12. Chemical Cleaning Works for BOA to Tallisman Malaysia Limited Ramunia Fabricators Sdn Bhd January 2008

Project Track Record 2007

No. Project Title Owner Client Completion Date
1. To perform cleaning at chemicals bund at Centralised Utility Facilities, Petronas Gas Berhad. Petronas Gas Berhad Petronas Gas Berhad November 2007
2. Water Injection Treatment Facilities Module for Sumandak Development Project (Phase II) for Global Process Systems Sdn Bhd. Chemical Cleaning Works.   Pacific Advance Composites Sdn Bhd September 2007
3. Titan Butadiene Storage and Export Facility at Pasir Gudang, Johor. Scope of Work
Provision of the supervision, office set-up, labor, tools consumables, construction equipment, temporary materials, specialized services, inspection, and all other third party services to carry out the passivation of the competent personal to carry out the works.
Titan Petchem PEC () Sdn Bhd. October 2007
4. The Provision of mobile system of WWT facilities and associated works.
Scope of Works
-To carry out temporary activated carbon treatment for WWTP operation.
-To treat of specification of treated waste water to reduce COD to less than 100 ppm using activated carbon.
-Expected facilities to cater 80m³ @ hr flow rate. Detail scope and working arrangement.
Optimal Chemical (M) Sdn Bhd Optimal Chemical (M) Sdn Bhd October 2007
5. Procurement, Construction & Commissioning of the Puteri Wellhead Platform for the Puteri Field Development. Package : Acid Cleaning Sub-contract.   Kencana HL Sdn Bhd October 2007
6. Cakerawala Phase 2 Early Gas Brownfield Construction Contract.
Chemical Cleaning of PG Lines – Feed Gas Separator Train 1 & 2 (Offshore)
Petronas Carigali Sdn Bhd Best Wide MCCS Sdn Bhd On-hold
7. C06-025 Reliance KDG-6 Fabrication of Subsea Structures Aker Kvaener. Package : Flushing & Hydrotest Sub-Contract.   Kencana HL Sdn Bhd October 2007
8. Chemical Cleaning / Flushing of Pipe Work and Rental of Equipment for Underground Chilled Water Pipe Lines for Proposed District Cooling System Plant for Johor New Administrative Centre, Bandar Nusajaya, Johor.   Jana DCS Sdn Bhd October 2007
9. Chemical Cleaning of 18 units of Aircooled Turbine Exhaust Condenser at Connaught Bridge Power Station. Tenaga Nasional Berhad Stesen Janaelektrik Jabbatan , Klang July 2007
10. Chemical Cleaning of PSS Filter Media Petronas Penapisan (T) Sdn Bhd Petronas Penapisan (T) Sdn Bhd April 2007
11. Supply of Manpower, Supervision, Tools, Equipment and consumables for Flushing of Hydraulic Systems.   Marine and Heavy Sdn Bhd April 2007
12. Petronas Carigali Sdn Bhd-Topside Major Maintenance (TMM) Services. Provision of DRF-Chemical Cleaning at Duyong Platform Petronas Carigali Sdn Bhd Vastaluk Sdn Bhd March 2007

Project Track Record 2006

No. Project Title Owner Client Completion Date
1. Chemical Cleaning of FPSO Bunga Kertas   Mushtari Engineering & Trading Sdn Bhd December 2006
2. To Perform Chemical Cleaning for 1 Unit of Heat Exchanger, E-1403 at AMB’s workshop Gebeng   Amalgamated Metal Builders (M) Sdn Bhd November 2006
3. Chemical Cleaning of GAC (5 set) Tenaga Nasional Bhd TNBH SJ Kenyir October 2006
4. Chemical Cleaning Works for 7 units of TLE Heat Exchanger for Optimal Olefin Plant at Dialog Kerteh Old Workshop for Optimal Chemicals (M) Sdn Bhd Chemical Cleaning & Waste Disposal Services   Dialog Plant Services Sdn Bhd August 2006
5. To supply of manpower, supervision, tools, consumables and additional fittings for Chain Jack Hydraulic Line Oil Flushing and Pressure Testing, Kikeh DTU Truss Spar Hull.   Marine and Heavy Engineering Sdn Bhd August 2006
6. Hot Oil and Chemical Cleaning   Dynac Sdn Bhd March 2006
7. 2006 Plant Turnaround Work for EOG, Utilities, Butanol & Derivatives at Optimal Petrochemical Complex, Kertih Terengganu.
Cleaning & Waste Disposal Services
  Dialog Plant Services Sdn Bhd March 2006
8. Chemical Operation at MG0316 Alam Warisan Precinct 5, Putrajaya   Megatara Sdn Bhd April 2006
9. To supply water tank, diesel pumps, crane services for chemical cleaning MMU 2nd Phase Cyberjaya   UAT Air-Conditioning Sdn Bhd February 2006
10. Provision of Supervisory Manpower and Equipment for soaking process of HX-260 and HX630 During Tinggi A Platform Shutdown   Oilfield Pipeline Inspection Sdn Bhd February 2006

Project Track Record 2005

No. Project Title Owner Client Completion Date
1. Chemical Cleaning for Cliff Head ‘A’ Platform (ROC Oil)   HL Engineering (M) Sdn Bhd-Lumut December 2005
2. Provision of Supply Manpower, Equipment, Tools and Chemicals complete the procedure for the chemical cleaning job for E-8202 Bucs Calandria at Derivatives Plant   Optimal Chemicals () Sdn Bhd October 2005
3. Chemical Cleaning / Acid Cleaning at FPSO Bunga Kertas   Vastalux Sdn Bhd December 2005
4. Provision of Manpower, Equipment, Tools, Materials and Consumables for Hot Water Cleaning Services of Fibrebond 20HV-FDA Pipe Spools for Talisman Talisman Malaysia Limited Pacific Advance Composites Sdn Bhd July 2005
5. Supply of Manpower,Chemical Cleaning/Water for Chilled Water Pipeline at Proposed Business Hotel KLCC   Sunway Construction Sdn Bhd January 2005
6. Chemical Cleaning for Steam Lines (3 Circuits) TNBH SJ Kenyir TNB Generation December 2005
7. Chemical Cleaning of 5 Sets of Spare Cooler      
8. Provision of Manpower, equipment, material and consumables for chemical cleaning works for TLE Heat Exchanger furnace no. 6.   Optimal Chemicals () Sdn Bhd Jun 2006

Project Track Record 2004

No. Project Title Owner Client Completion Date
1. AFC chemical cleaning for PDH emergency shutdown MTBE (M) Sdn Bhd MTBE (M) Sdn Bhd 9 Jan 05
2. Fabrication, hook up and commissioning & associated modifications of Duyong Gas Compression Module (DYG-GCM) ; Provision of acid cleaning of pipeline (offshore) Petronas Carigali SB HL Engineering Sdn Bhd 5 Dec 04
3. Fabrication, hook up and commissioning & associated modifications of Duyong Gas Compression Module (DYG-GCM); Provision of acid cleaning of pipeline and lube oil flushing of lube oil cooler. Petronas Carigali SB HL Engineering Sdn Bhd 15 Oct 04
4. Optimal Chemical Plant Shutdown Project; Provision of chemical cleaning of incinerator quench water piping for utilities plant. Optimal Chemicals (M) Sdn Bhd UBF Sdn Bhd 12 Sept 04
5. EPCC of Precinct 5 District Cooling Plant chilled water distribution package Putrajaya Holdings HL Engineering Sdn Bhd Jan 06
6. TNB Hydro (TNBH) Sultan Mahmud Power Station project; chemical cleaning of fin cooler. TNBH Sdn Bhd TNBH Sdn Bhd Dec. 05
7. Chemical Cleaning / Water for Chilled Water Pipeline At Putrajaya, Parcel Z Putrajaya Holdings Pathfinder M & E Sdn Bhd 02 Jan 04
8. Chemical Cleaning for DRF Piping at Duyong CPPD-302 – Duyong Offshore Platform Petronas Carigali Sdn Bhd Dayang Enterprise Sdn Bhd Feb. 04
9. Jerneh B Acid Cleaning And Lube Oil ESSO Prod. Malaysia Inc. (EMEPMI) Dayang Enterprise Sdn Bhd 14 Jan 04
10. Cooling Water System Passivation in PDH During Plant Turnaround MTBE Sdn Bhd MTBE Sdn Bhd April 04
11. Chemical Cleaning of Air Fin Coolers (E 2001-E2004) Works During PDH Turnaround 2004 MTBE Sdn Bhd Mushtari Maintenance Services Sdn Bhd April 04
12. Turnaround Services for OXO-Syngas Plant at Kuantan for BPC, April 2004. BASF-Petronas Chemical Dialog Plant Services Sdn Bhd March 04
13. Chemical Cleaning / Water Putrajaya Holdings Sunline M & E Services Sdn Bhd June 04
14. Chemical Cleaning/Water for Chilled Water Pipeline Sunway Constructions Sdn Bhd Sunway Engineering Sdn Bhd April 04
15. Water Flushing / Initial Treatment for Chilled Water Pipeline Putrajaya Holdings. Sunway Engineering Sdn Bhd May 04
16. Chemical Cleaning / Water Chilled Water Pipeline Putrajaya Holdings. Sunway Engineering Sdn Bhd May 04
17. Acid Cleaning of Hydraulic System for Kizomba – B Project for Off Skid Line. Petronas Carigali SB Shipyard & Engineering Sdn Bhd June 04
18. Chemical Cleaning for West Natuna Phase II Fuel Gas System E-3110 and E-3120 Petronas Carigali SB Amalgamated Metal Builders (M) Sdn Bhd June 04
19. Chemical Cleaning / Water Flushing for cooling water system for Mahkamah Terengganu Mahkamah Terengganu JKR Cawangan Kejuruteraan Mekanikal Negeri Terengganu June 04
20. Fabrication, Hook-Up Commissioning of Duyong Compressor Module (DYG-GCM) and Associated Modification for (Phase II) Petronas Carigali SB HL Engineering (M) Sdn Bhd July 04
21. Chemical Cleaning of Murphy Oil West Patricia Production Platform B. Optional for Water Injection (W1) Piping Only Murphy Oil () SB HL Engineering (M) Sdn Bhd Aug. 04
22. The Site Erection and Installation of Plant Rejuvenation Project for 2004 Turnaround for Methanol () Sdn Bhd – Chemical Cleaning Petronas Methanol () Sdn Bhd Dialog E & C Sdn Bhd Aug. 04

Project Track Record 2003

No. Project Title Owner Client Completion Date
1. Provision Of Chemical Cleaning at Petronas Penapisan (Terengganu) Sdn Bhd, Kemaman Petronas Penapisan (Terengganu) Sdn Bhd Petronas Penapisan (Terengganu) Sdn Bhd 01July 03
2. Jerneh A Acid Cleaning And Lube Oil ESSO Prod. Malaysia Inc. (EMEPMI) Dayang Enterprise Sdn Bhd 20 Dec 03
3. Chilled Water Distribution Piping at Putrajaya Core Island DCS commissioning Putrajaya Holding Berhad Ho Hup Construction Com Bhd 26 Dec. 03
4. Lube Oil Lines at B11P-A Utilities Topsides lube oil flushing Shell Sime Sembcorp Engineering S/B 03 April 03
5. Proposed construction and commissioning of the relocation of NPS 20” Lateral pipeline at precinct 11 Putrajaya Putrajaya Holdings SB PB Gas Sdn Bhd  
6. Acid cleaning work at ANDP-C & E Topsides Shell Sime Sembcorp Engineering S/B 17 April 03
7. Kompleks Kehakiman 5 Tingkat dan Bangunan Mahkamah 2 tingkat di Putrajaya Putrajaya Holding Sunline Technical Services SB 05 May 03
8. Lube Oil Lines at B11P-A Utilities Topsides Shell Sime Sembcorp Engineering S/B 20 May 03
9. Chemical Cleaning at GPP2 Compressor House Petronas Gas Berhad Petronas Gas Berhad 19 May 03
10. Topsides Deck BR-A Annexe MOAB Chemical Cleaning work Talisman (M) Limited Shipyard And Engineering Sdn Bhd 01July 03

Project Track Record 2002

No. Project Title Owner Client Completion Date
1. 11 Column / Tower for Belanak FPSO Development Petronas Carigali Sdn Bhd KNM Steel Sdn Bhd 05 Nov 02
2. Chemical Cleaning Works on Tube Boilers at FSO-Puteri Dulang Petronas Carigali Sdn Bhd Romilly (M) Sdn Bhd

08 Nov 02

3. Putrajaya Precinct 2 ( ) District Cooling Plant Project EPCC Of Chilled Water Distribution Piping Package (Package 2) Putrajaya Holdings Sdn Bhd Ho Hup Construction Company Berhad, February 11
4. Rental of Pump for water flushing and water treatment works   Sunway Engineering Sdn Bhd 02 May 02
5. Rental of Diesel Engine Driven End Suction Pump for water flushing and Passivation works ESSO Prod. Malaysia Inc. (EPMI) Resources Sdn Bhd 31Jan 02
6. Lube Oil and Chemical Cleaning of Lube Oil Spools for Irong Barat – A Platform ESSO Prod. Malaysia Inc. (EPMI) Resources Sdn Bhd  
7. Chemical Cleaning for Bintang A & B Topsides Project, Johor ESSO Prod. Malaysia Inc. (EPMI) SimeSembcorp Engineering S/B  
8. Lumut Power Plant – Block 3 3 x KA 13E2 Heat Recovery Steam Generator -Chemical Cleaning TNB Janamanjung SB Impian Tekad Sdn Bhd  
9. Chemical Cleaning Work (Piping) for Helang Central Platform Integrated Topsides ESSO Prod. Malaysia Inc. (EPMI) Shipyard And Engineering Sdn Bhd 15 Aug 02
10. Acid Cleaning Works – KNP-A Compressor Module Project ESSO Prod. Malaysia Inc. (EPMI) Shipyard And Engineering Sdn Bhd 15 Aug 02
11. Treatment Of Solution Waste Up to D.O.E. Standard A Before Discharging at Putrajaya Putrajaya Holdings Sdn Bhd Tractors (M) Sdn Bhd, 6 Aug 02
12. Duyong Gas Tie-In Project Petronas Gas Bhd Sarku Engineering Services S/B 16 July 02
13. Chemical Cleaning / Water for Chilled Water Pipeline Putrajaya Holdings Sdn Bhd Pathfinder M & E Sdn Bhd 15 July 02
14. Perlis Power Plant – Block 3- 3 x KA 13E2 Heat Recovery Steam Generator - Chemical Cleaning TNBG SB Impian Tekad Sdn Bhd 26 Aug 02
15. Rental of Diesel Engine Driven End Suction Pump for water flushing of chilled water distribution pipeline.   Mega Air-Conditioning Sdn Bhd 08 July 02
16. Larut A Topsides Project, Provision of chemical cleaning ESSO Prod. Malaysia Inc. (EPMI) Shipyard And Engineering Sdn Bhd 20 Nov 02
17. Unit 2 Boiler Feed Pumps Cooler Chemical Cleaning at SJ Sultan Salahuddin Abdul Aziz, Kapar Selangor TNB Generation Sdn Bhd TNB Generation Sdn Bhd 27 Nov 02

Project Track Record 2001

No. Project Title Owner Client Completion Date
1. Acid Cleaning (Piping) Work for E11K-A Topsides Project Shell Berhad Shipyard And Engineering SB (MSE) 12 Nov 01
2. Chemical Cleaning of EA-202A-A/B, EA-202B-A/B, EA-203A/B and EA-204A/B Air Fin Coolers. MTBE Sdn Bhd MTBE Sdn Bhd

27 Aug 01

3. Butanol/Derivaties Facilities Project- Chemical Cleaning works Optimal Chemicals () Sdn Bhd. Bechtel Bina (Malaysia) S/B 05 Apr 01
4. Kertih Centralised Tankage –tank cleaning and commissioning Kertih Terminals Sdn Bhd Dialog Plant Services S/B 28 May 01
5. Waste Handling & Transportation Jobs From BPC Sludge Tank at to Wastewater Treatment Plant at BPC, Gebeng. BASF Petronas Chemicals Sdn Bhd BASF Petronas Chemicals Sdn Bhd 17 May 01 1

Project Track Record 2000

No. Project Title Owner Client Completion Date
1. Larut A Topsides Project ESSO Shipyard And Engineering Sdn Bhd 16 Nov 00
2. Unit 2 Boiler Feed Pumps Cooler Chemical Cleaning at SJ Sultan Salahuddin Abdul Aziz, Kapar Selangor TNB Generation Sdn Bhd TNB Generation Sdn Bhd 15 Nov 00
3. 4 Unit High Pressure Heaters Chemical Cleaning at SJ Sultan Salahuddin Abdul Aziz, Kapar Selangor TNB Generation Sdn Bhd TNB Generation Sdn Bhd 16 Aug 00
4. Chemical Cleaning Of Oxygen Pipelines From Buffer Tank To Megasteel. Secomex Manufacturing (M) Sdn Bhd Secomex Manufacturing (M) Sdn Bhd  
5. Waste Handling & Transportation Jobs From BPC Sludge Tank at to Wastewater Treatment Plant at BPC, Gebeng. BASF Petronas Chemicals Sdn Bhd BASF Petronas Chemicals Sdn Bhd  
6. Resak Hook Up And Commissioning Works Petronas Carigali Sdn Bhd Edwards And Sons (EM) Sdn Bhd  
7. Chilled Water & Initial Treatment Chemicals for Main Lines at Bangsar TNEC Operation & Maintenance Sdn Bhd TNB Engineering & Consultancy Sdn Bhd  

Oversea Project

No. Project Title Owner Client Completion Date
1. Pipeline Cleaning / water flushing / initial Chilled Water Treatment and passivation for DCS of The Green Community Dubai Investment Park ; DCS Plant Package A Ali Haji Abdullah Awazi Gargash – Insafoam JV/Coolrich General Maintenance L.L.C C/O Gargash Construction Nov 03
2. Supports Fabrication and Pipe Installation DIFC-Spine Tunnel District Cooling Distribution Work DIFC, Dubai, U.A.E. Drake & Scull International. 15 Nov 00
3. Supply and Install External Chilled Water Network. Ritaj Residence on Plot 597-592 at Dubai Investments Park. DIP, Dubai, U.A.E. Dubai Investment Real Estate Company 16 Aug 00
4. Provision, Execution, Commissioning and Completion of District Cooling Plant and Energy Transfer Stations DIP, Dubai, U.A.E. Emicool L.L.C.  
5. Provision, Execution, Commissioning and Completion of District Cooling Plant and Energy Transfer Stations. Motor City District Cooling Project. Motor City, Dubai, U.A.E. Emicool L.L.C. Sdn Bhd  
6. Resak Hook Up And Commissioning Works Petronas Carigali Sdn Bhd Edwards And Sons (EM) Sdn Bhd  
7. Chilled Water & Initial Treatment Chemicals for Main Lines at Bangsar TNEC Operation & Maintenance Sdn Bhd TNB Engineering & Consultancy Sdn Bhd  
No. 19, Jalan Marikh U5/174, Bandar Pinggiran Subang (Subang 2), 40150 Shah Alam, Selangor Darul Ehsan. Tel No : +603 - 2201 4222 (Office)
Copyright © 2013 ZERBINA ENGINEERING SDN. BHD. All rights reserved.Designed By Netbusiness Solution.